Beleidsstudie van het Europees Parlement (TRAN) over walstroom
Sustainable Ships co-authored an assessment of pricing and price transparency for e-charging and onshore power supply (OPS) for the European Parliament. The work examined how OPS tariffs are structured across European ports under AFIR and FuelEU Maritime, finding that shore power is typically supplied under monopoly conditions with no common EU pricing standard, which creates a clear risk of unreasonable and hard-to-compare tariffs.
Technische beoordeling walstroom HVSC-containeterminal
Subcontracted by Seabridges, Sustainable Ships provided an independent technical review of a high-voltage shore power (HVSC) installation for large container ships, working alongside Seabridges. The review covered system architecture, electrical integration with the terminal grid, and compliance with IEC/IEEE 80005 standards, supporting the client in validating key technical decisions and reducing implementation risk.
Project BOEI
Sustainable Ships performed a techno-economic feasibility study for the Province of South Holland and InnovationQuarter on offshore charging of tankers at the Scheveningen anchorage. The study combined technical assessment with economic analysis and was supported by a purpose-built parametric tool to explore design and cost sensitivities, concluding that offshore charging is both technically and economically feasible.
Port of Rotterdam
Sustainable Ships provided the Port of Rotterdam with a techno-economic shore power feasibility study and a custom assessment tool for shipowners. The work estimated conversion costs, identified key technical challenges, and outlined applicable standards and retrofit requirements for connecting vessels to shore power. The study enables shipowners to quickly assess the technical implications and indicative costs of shore power conversion, supporting informed investment and retrofit decisions.
Walstroom Calandkanaal
Een van onze crewleden heeft de grootste walstroomaansluiting in Rotterdam – 20 MW – van begin tot eind gerealiseerd, van het eerste idee, via het ontwerp, tot aan projectmanagement en uitvoering.